Construction on the 600 block of Main Street. Photo taken July 25.
“The survival of the Theater District is not just the rail or the buildings; it’s the people. Without people, it’s not a theater district.” – Harold Cohen, former dean of architecture at University at Buffalo, who was the man behind the original project that brought the rail and the pedestrian mall to Main Street
A construction crew works with a concrete slab on the 600 block of Main Street. The pedestrian mall that has been in place for three decades is being removed.
Construction on the 600 block of Main Street. Photo taken July 25.
Construction on the 600 block of Main Street. Photo taken July 25.
Buffalo’s Main Street is tangled in construction, heavy machinery and high expectations. The pedestrian mall is being removed; curbs, pavement and sidewalks are being torn up. Main Street is undoing its 30-plus-year run of having no traffic.
“The survival of the Theater District is not just the rail or the buildings; it’s the people. Without people, it’s not a theater district.” – Harold Cohen, former dean of architecture at University at Buffalo, who was the man behind the original project that brought the rail and the pedestrian mall to Main Street
A construction crew works with a concrete slab on the 600 block of Main Street. The pedestrian mall that has been in place for three decades is being removed.